Place the nails along the edge of the valley metal not into it.
Proper way to shingle a roof valley.
In addition it is important to avoid nailing the shingles through the valley metal.
To shingle out of the valley with laminated shingles lay a shingle down as a gauge and mark the corner at the bottom left and top right of the roof.
The original plan was to preserve a portion of the existing roof since.
Only nail at the edges with only enough nails to.
One nail goes into the top section of the shingle where it covers the valley metal.
All valleys start the same.
Each flashing should overlap the one below by at least 75 mm 3 but not be visible below the shingle top lap.
Then starting at the base of the.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing.
This picture gives you an idea of the condition of the existing roof plywood and you.
However these shingles are not run entirely through the valley area but rather the center of the metal valley is left exposed.
To secure the roof valley flashing nail it down carefully.
I then move the shingle to the uppermost course on the roof plane line up the mark on the shingle with the valley center and again mark the corner.
Imbed each step flashing in a 75 mm 3 wide application of asphaltic plastic cement and nail in place.
Remove existing roof and underlayment.
Repeat this basic pattern alternating shingles across the roof working toward the right side using the chalk line to keep the shingles straight horizontally.
There are two simple rules to follow.
How to shingle a roof 90 pics pro tips recommendations step 1.
Laminated shingles let you start in the valley and work outward which can be an advantage in some situations.
As the asphalt shingles are installed over the roof deck the shingles are extended into the valley.
From the stepped off main part of the roof run shingles into the valley and cut them square from where the bottom corner intersects with the shingles nailed along the valley line.